Unfortunately, I was not able to present the show for 2010. We will be back bigger and better than ever for 2011!
Let me state first that no one is more disappointed by this than myself. I do not take the honor of being a part of the holiday traditions of families in Southern Indiana lightly and it is beyond disappointing that I was unable to put up the lights this season.
I have heard many versions of the reason for this circulating, from the heartwarming to the sublime. Let me state for the record that I am not suffering from some sort of life threatening illness and that the City or Seymour, nor any of my neighbors played any part in the cancellation of this season's show. It was really a combination of things.
As some of you may know, I also direct Fear Fair, a large haunted attraction in Seymour. We recently completed our tenth season and very exciting things are happening for us. We are going to be a featured tour for a national convention known as Hauntcon which will be held in Louisville, KY this coming April. This is a big opportunity for Fear Fair to gain some national exposure and help us to take it to the next level in terms of attendance. It's a blessing in so many ways, but it also turned the world upside down in terms of the build schedule. Basically, everything that normally must be completed by the last weekend in September must now be done by the last week of April. We are working full tilt to complete the haunt renovations and it just left no time for the light display. We also had a particularly labor intensive haunt season and I did have about a month long fight with the flu, which caused me to be unable to start preparing the show during October. This really made it impossible to have the lights on in time. I posted that the show would be cancelled on the Seymour Lights Facebook profile as well as my personal sites, but neglected to update the actual web site, apologies for that.
Seymour Lights takes seven 12 hour days, just to put up, wire and test. Hundreds more hours go into the off-season construction of display elements, video production, sequencing of the actual light show, etc. There was simply not enough time. I believe in doing things right or not at all, so I chose to take the year off and come back strong in 2011 with a show that will blow your mind. I already had giant fireworks lights, flame generators and so much more underway for 2010 and I will be adding much more from May to December. Next year's show will knock your socks off, I promise!
So, once again, I apologize for any inconvenience cause by the lack of a show this year and I can't wait to bring you the best show ever for 2011! Merry Christmas and Happy New Year!
Wednesday, December 29, 2010
Saturday, August 7, 2010
Fireworks Lights for 2010
Made solid headway today, should be down to final assembly next.
All of the rope light segments for both fireworks are now corded and ready to go on.
After finishing up the last of those, I painted the larger spokes, so those are ready for rope light.
I also got the LED C9's for the tips of the spokes ready to go. Turns out Action Lighting sent me sockets for SPT2 although I specified SPT1 and the order actually says SPT1. Since I live in the middle of nowhere and really can't afford to wait a week to get the right sockets here, I had to make it work. I just carefully positioned the wire in the sockets so that both sides were pierced, then cut little sections of wire tie as a spacer to hold the wire snug in the socket. It actually worked out just fine, so those are ready to go on as well.
Now I just need to get the rope light attached to the spokes and wiring done for each spoke assembly, finish my two JUMP poles and this one will be in the can. Such a chore!
All of the rope light segments for both fireworks are now corded and ready to go on.
After finishing up the last of those, I painted the larger spokes, so those are ready for rope light.
I also got the LED C9's for the tips of the spokes ready to go. Turns out Action Lighting sent me sockets for SPT2 although I specified SPT1 and the order actually says SPT1. Since I live in the middle of nowhere and really can't afford to wait a week to get the right sockets here, I had to make it work. I just carefully positioned the wire in the sockets so that both sides were pierced, then cut little sections of wire tie as a spacer to hold the wire snug in the socket. It actually worked out just fine, so those are ready to go on as well.
Now I just need to get the rope light attached to the spokes and wiring done for each spoke assembly, finish my two JUMP poles and this one will be in the can. Such a chore!
Monday, July 12, 2010
ICE 2010
Each year a convention is held in Indianapolis for extreme Christmas nuts such as myself. Folks travel from as far away as Arizona for this event. This year, I was honored to present a session on dmx lighting for those assembled. Later, we did a live demo of the new LPG flame generators that will be featured as a part of Seymour Lights 2010.
Saturday, June 26, 2010
Working on the fireworks lights project
I finally got started this week on one of my 2010 projects, fireworks lights. This isn't an original design of mine; Joel Rose on the Do It Yourself Christmas Forum is doing a very similar project and I borrowed his basic design.
First I made the hub:
Next step was to weld up the spokes. There are eight of these with four 6.5 foot stalks each. I made a jig on an old sheet of board so I could make each of the units match.
Here are all eight spoke units welded up and ready to go.
And here's the hub on a temporary pole with the spoke units installed. When it's mounted properly, it will slide on the pole and be pulled up by two cables and a winch. There will be three guy wires attached to the bottom of the hub that will be tight when it's fully raised.
Next project are the 32 sections of rope light that need prepped and installed.
First I made the hub:
Next step was to weld up the spokes. There are eight of these with four 6.5 foot stalks each. I made a jig on an old sheet of board so I could make each of the units match.
Here are all eight spoke units welded up and ready to go.
And here's the hub on a temporary pole with the spoke units installed. When it's mounted properly, it will slide on the pole and be pulled up by two cables and a winch. There will be three guy wires attached to the bottom of the hub that will be tight when it's fully raised.
Next project are the 32 sections of rope light that need prepped and installed.
Wednesday, May 26, 2010
Saturday, February 27, 2010
2010 Channel Layout Finalized
I am sometimes asked what the schematic looks like for the dispay. Well, I don't really do one of those, but there is a channel layout that shows what controllers/channels control what display elements. I spent 8 hours laying it out today and I believe it is finalized.
We added nine additional controllers from 2009..
2010 Channel Layour (PDF)
We added nine additional controllers from 2009..
2010 Channel Layour (PDF)
Sunday, February 14, 2010
One Fan Down - Two More to Go
Alright, one fan completely done. Blue is finished.
This thing really ended up with a LOT of wire on it. Pretty darn heavy too!
All folded up and ready to go off to storage in the folks' barn.
Two more to go. I am not sure if I will start on the next one right away or do another project in between... this REALLY got monotonous.
This thing really ended up with a LOT of wire on it. Pretty darn heavy too!
All folded up and ready to go off to storage in the folks' barn.
Two more to go. I am not sure if I will start on the next one right away or do another project in between... this REALLY got monotonous.
Subscribe to:
Posts (Atom)